Grid

Projects

Projects

Where is PwllfaWatkin AD Plant (Waste AD) up to?

Each status below comes from a named source and date.

Anaerobic digestion · Wales

Planning

Planning
Withdrawn
10 Sep 2012
DESNZ REPD, 3 Aug 2026

Connection

Connection
Anaerobic digestion project, epj_216c1a92022ae01f

Measures

Rated power
2.3 MW
Connection capacity
Not published
Storage energy
Not published