Projects
Where is PwllfaWatkin AD Plant (Waste AD) up to?
Each status below comes from a named source and date.
Anaerobic digestion · Wales
Planning
- Planning
- Withdrawn
- 10 Sep 2012
- DESNZ REPD, 3 Aug 2026
Connection
- Connection
- Anaerobic digestion project, epj_216c1a92022ae01f
Measures
- Rated power
- 2.3 MW
- Connection capacity
- Not published
- Storage energy
- Not published