Grid

Projects

Projects

Where is The Range Distribution Centre, Severn Beach - Solar panels up to?

Each status below comes from a named source and date.

Solar PV · England, South West

Planning

Planning
Granted
28 Jul 2025
DESNZ REPD, 3 Aug 2026
Construction
Not started
DESNZ REPD, 3 Aug 2026
Operational status
Proposed
DESNZ REPD, 3 Aug 2026

Connection

Connection
Solar PV project, epj_224acf1d1ca9de53

Measures

Rated power
2.4 MW
Connection capacity
Not published
Storage energy
Not published