Projects
Where is Stallingborough Biomass Power Plant up to?
Each status below comes from a named source and date.
Biomass · England, Yorkshire and Humber
Planning
- Planning
- Revised
- 16 Feb 2007
- DESNZ REPD, 3 Aug 2026
- Operational status
- Proposed
- DESNZ REPD, 3 Aug 2026
Connection
- Connection
- Biomass project, epj_25832a1a4a0e8401
Measures
- Rated power
- 65.0 MW
- Connection capacity
- Not published
- Storage energy
- Not published