Where is Seghill Household Waste Recovery Centre - Solar Panels up to?
Each status below comes from a named source and date.
Solar PV · England, North East
Planning
- Planning
- Application submitted
- 8 Dec 2025
- DESNZ REPD, 3 Aug 2026
- Operational status
- Proposed
- DESNZ REPD, 3 Aug 2026
Connection
- Connection
- Solar PV project, epj_2676a89e8e565373
Measures
- Rated power
- 5.8 MW
- Connection capacity
- Not published
- Storage energy
- Not published