Grid

Projects

Projects

Where is North London Heat and Power (Edmonton EcoPark Replacement) up to?

Each status below comes from a named source and date.

Energy from waste · England, London

Planning

Planning
Granted
24 Feb 2017
DESNZ REPD, 3 Aug 2026
Construction
Under construction
1 Oct 2022
DESNZ REPD, 3 Aug 2026
Operational status
Proposed
DESNZ REPD, 3 Aug 2026

Connection

Connection
Energy from waste project, epj_29ffe7e3d1b49dad

Measures

Rated power
70.0 MW
Connection capacity
Not published
Storage energy
Not published