Where is Crowmarsh Battle Farm (Farm AD) up to?

Each status below comes from a named source and date.

Anaerobic digestion · England, South East

Planning

Planning
Granted
30 Mar 2011
DESNZ REPD, 3 Aug 2026
Construction
Built
DESNZ REPD, 3 Aug 2026
Operational status
Operational
17 May 2013
DESNZ REPD, 3 Aug 2026

Connection

Connection
Anaerobic digestion project, epj_2b3f9dce65cc73b8

Measures

Rated power
2.3 MW
Connection capacity
Not published
Storage energy
Not published