Where is Plusterwine House - Anaerobic Digestion Plant (Retrospective) up to?

Each status below comes from a named source and date.

Anaerobic digestion · England, South West

Planning

Planning
Granted
2 Mar 2021
DESNZ REPD, 3 Aug 2026
Construction
Built
DESNZ REPD, 3 Aug 2026
Operational status
Operational
31 Dec 2016
DESNZ REPD, 3 Aug 2026

Connection

Connection
Anaerobic digestion project, epj_2d7b5a18857ace2b

Measures

Rated power
1.5 MW
Connection capacity
Not published
Storage energy
Not published