Projects
Where is Mapledurham farm AD (Farm waste) up to?
Each status below comes from a named source and date.
Anaerobic digestion · England, South East
Planning
- Planning
- Withdrawn
- 19 Jul 2013
- DESNZ REPD, 3 Aug 2026
Connection
- Connection
- Anaerobic digestion project, epj_302d62a50cd2ac0d
Measures
- Rated power
- 1.5 MW
- Connection capacity
- Not published
- Storage energy
- Not published