Grid

Projects

Projects

Where is Mapledurham farm AD (Farm waste) up to?

Each status below comes from a named source and date.

Anaerobic digestion · England, South East

Planning

Planning
Withdrawn
19 Jul 2013
DESNZ REPD, 3 Aug 2026

Connection

Connection
Anaerobic digestion project, epj_302d62a50cd2ac0d

Measures

Rated power
1.5 MW
Connection capacity
Not published
Storage energy
Not published