Grid

Projects

Projects

Where is Melton Energy from Waste Plant up to?

Each status below comes from a named source and date.

Advanced conversion · England, Yorkshire and Humber

Planning

Planning
Revised
22 Dec 2011
DESNZ REPD, 3 Aug 2026
Operational status
Proposed
DESNZ REPD, 3 Aug 2026

Connection

Connection
Advanced conversion project, epj_31e13d0a16b4b33c

Measures

Rated power
24.0 MW
Connection capacity
Not published
Storage energy
Not published