Where is Melton Energy from Waste Plant up to?
Each status below comes from a named source and date.
Advanced conversion · England, Yorkshire and Humber
Planning
- Planning
- Revised
- 22 Dec 2011
- DESNZ REPD, 3 Aug 2026
- Operational status
- Proposed
- DESNZ REPD, 3 Aug 2026
Connection
- Connection
- Advanced conversion project, epj_31e13d0a16b4b33c
Measures
- Rated power
- 24.0 MW
- Connection capacity
- Not published
- Storage energy
- Not published