Projects
Where is Long Stratton Leisure Centre, Long Stratton - Solar Panels up to?
Each status below comes from a named source and date.
Solar PV · England, Eastern
Planning
- Planning
- Granted
- 18 Feb 2025
- DESNZ REPD, 3 Aug 2026
- Construction
- Not started
- DESNZ REPD, 3 Aug 2026
- Operational status
- Proposed
- DESNZ REPD, 3 Aug 2026
Connection
- Connection
- Solar PV project, epj_320884b35f313b28
Measures
- Rated power
- 0.1 MW
- Connection capacity
- Not published
- Storage energy
- Not published