Grid

Projects

Projects

Where is Malcolmwood Farm, Loanend Road - Battery Energy Storage System up to?

Each status below comes from a named source and date.

Battery · Scotland

Planning

Planning
Application submitted
19 Aug 2025
DESNZ REPD, 3 Aug 2026
Operational status
Proposed
DESNZ REPD, 3 Aug 2026

Connection

Connection
Battery project, epj_333d6240f24f76a2

Measures

Rated power
49.5 MW
Connection capacity
Not published
Storage energy
Not published