Grid

Projects

Projects

Where is Newtown Road - Solar Panels & Air Source Heat Pumps up to?

Each status below comes from a named source and date.

Solar PV · England, South East

Planning

Planning
Granted
13 Mar 2023
DESNZ REPD, 3 Aug 2026
Construction
Not started
DESNZ REPD, 3 Aug 2026
Operational status
Proposed
DESNZ REPD, 3 Aug 2026

Connection

Connection
Solar PV project, epj_34c395abb0245ec2

Measures

Rated power
0.2 MW
Connection capacity
Not published
Storage energy
Not published