Where is Cumbernauld BioPlant (Waste AD) up to?

Each status below comes from a named source and date.

Anaerobic digestion · Scotland

Planning

Planning
Granted
20 Dec 2004
DESNZ REPD, 3 Aug 2026
Construction
Built
1 Sep 2010
DESNZ REPD, 3 Aug 2026
Operational status
Operational
5 Oct 2011
DESNZ REPD, 3 Aug 2026

Connection

Connection
Anaerobic digestion project, epj_3cb7ac04c34ecf50

Measures

Rated power
2.4 MW
Connection capacity
Not published
Storage energy
Not published