Projects
Where is Verge at Bickland Industrial Estate - Energy Storage System up to?
Each status below comes from a named source and date.
Battery · England, South West
Planning
- Planning
- Application submitted
- 22 May 2026
- DESNZ REPD, 3 Aug 2026
- Operational status
- Proposed
- DESNZ REPD, 3 Aug 2026
Connection
- Connection
- Battery project, epj_3cc3518cc95bb3b7
Measures
- Rated power
- 0.2 MW
- Connection capacity
- Not published
- Storage energy
- Not published