Projects
Where is Trumps Farm Landfill Scheme up to?
Each status below comes from a named source and date.
Landfill gas · England, South East
Planning
- Planning
- Granted
- 9 Dec 1996
- DESNZ REPD, 3 Aug 2026
- Construction
- Built
- DESNZ REPD, 3 Aug 2026
- Operational status
- Operational
- 14 Apr 1998
- DESNZ REPD, 3 Aug 2026
Connection
- Connection
- Landfill gas project, epj_45ade295b1fe6abe
Measures
- Rated power
- 2.9 MW
- Connection capacity
- Not published
- Storage energy
- Not published