Projects
Where is Grimethorpe Biomass Gasification Power Plant up to?
Each status below comes from a named source and date.
Biomass · England, Yorkshire and Humber
Planning
- Planning
- Withdrawn
- 4 Aug 2005
- DESNZ REPD, 3 Aug 2026
Connection
- Connection
- Biomass project, epj_4a559c07678c0b20
Measures
- Rated power
- 42.0 MW
- Connection capacity
- Not published
- Storage energy
- Not published