Where is Green Waste Composting Facility (Waste AD) up to?

Each status below comes from a named source and date.

Anaerobic digestion · England, South East

Planning

Planning
Granted
9 Jul 2012
DESNZ REPD, 3 Aug 2026
Construction
Built
DESNZ REPD, 3 Aug 2026
Operational status
Operational
20 May 2014
DESNZ REPD, 3 Aug 2026

Connection

Connection
Anaerobic digestion project, epj_4de625e5d6fd0621

Measures

Rated power
1.2 MW
Connection capacity
Not published
Storage energy
Not published