Where is Green Waste Composting Facility (Waste AD) up to?
Each status below comes from a named source and date.
Anaerobic digestion · England, South East
Planning
- Planning
- Granted
- 9 Jul 2012
- DESNZ REPD, 3 Aug 2026
- Construction
- Built
- DESNZ REPD, 3 Aug 2026
- Operational status
- Operational
- 20 May 2014
- DESNZ REPD, 3 Aug 2026
Connection
- Connection
- Anaerobic digestion project, epj_4de625e5d6fd0621
Measures
- Rated power
- 1.2 MW
- Connection capacity
- Not published
- Storage energy
- Not published