Where is Tynemouth Energy Storage System (TESS) up to?

Each status below comes from a named source and date.

Battery · England, North East

Planning

Planning
Granted
DESNZ REPD, 3 Aug 2026
Construction
Built
20 Dec 2018
DESNZ REPD, 3 Aug 2026
Operational status
Operational
25 May 2018
DESNZ REPD, 3 Aug 2026

Connection

Connection
Battery project, epj_52b253bb1a1e43e2

Measures

Rated power
25.0 MW
Connection capacity
Not published
Storage energy
Not published