Where is GXO Logistics, Hurricane Way South - Solar Panels up to?
Each status below comes from a named source and date.
Solar PV · England, Yorkshire and Humber
Planning
- Planning
- Revised
- 29 Aug 2024
- DESNZ REPD, 3 Aug 2026
- Operational status
- Proposed
- DESNZ REPD, 3 Aug 2026
Connection
- Connection
- Solar PV project, epj_5445ca63c16e74bc
Measures
- Rated power
- 0.5 MW
- Connection capacity
- Not published
- Storage energy
- Not published