Grid

Projects

Projects

Where is GXO Logistics, Hurricane Way South - Solar Panels up to?

Each status below comes from a named source and date.

Solar PV · England, Yorkshire and Humber

Planning

Planning
Revised
29 Aug 2024
DESNZ REPD, 3 Aug 2026
Operational status
Proposed
DESNZ REPD, 3 Aug 2026

Connection

Connection
Solar PV project, epj_5445ca63c16e74bc

Measures

Rated power
0.5 MW
Connection capacity
Not published
Storage energy
Not published