Where is Riverside Resource Recovery Facility (RRRF) up to?
Each status below comes from a named source and date.
Energy from waste · England, London
Planning
- Planning
- Granted
- 15 Jun 2006
- DESNZ REPD, 3 Aug 2026
- Construction
- Built
- 1 Sep 2010
- DESNZ REPD, 3 Aug 2026
- Operational status
- Operational
- 1 Sep 2011
- DESNZ REPD, 3 Aug 2026
Connection
- Connection
- Energy from waste project, epj_551ffde52627728a
Measures
- Rated power
- 72.0 MW
- Connection capacity
- Not published
- Storage energy
- Not published