Projects
Where is Lovedean Energy Storage System up to?
Each status below comes from a named source and date.
Battery · England, South East
Planning
- Planning
- Revised
- 29 Sep 2017
- DESNZ REPD, 3 Aug 2026
- Operational status
- Proposed
- DESNZ REPD, 3 Aug 2026
Connection
- Connection
- Battery project, epj_5ab71f5b84bf1061
Measures
- Rated power
- 49.9 MW
- Connection capacity
- Not published
- Storage energy
- Not published