Grid

Projects

Projects

Where is Burcot Solar Farm up to?

Each status below comes from a named source and date.

Battery · England, South East

Planning

Planning
Revised
10 Mar 2022
DESNZ REPD, 3 Aug 2026
Operational status
Proposed
DESNZ REPD, 3 Aug 2026

Connection

Connection
Battery project, epj_5e3bb8b7632a2cba

Measures

Rated power
49.9 MW
Connection capacity
Not published
Storage energy
Not published