Projects
Where is Tummel Bridge Power Station - Hydro Plant up to?
Each status below comes from a named source and date.
Hydro · Scotland
Planning
- Planning
- Granted
- DESNZ REPD, 3 Aug 2026
- Construction
- Built
- DESNZ REPD, 3 Aug 2026
- Operational status
- Operational
- 1 May 2024
- DESNZ REPD, 3 Aug 2026
Connection
- Connection
- Hydro project, epj_5faa514674f47569
Measures
- Rated power
- 40.0 MW
- Connection capacity
- Not published
- Storage energy
- Not published