Grid

Projects

Projects

Where is Walworth Academy, Shorncliffe Road - Solar Panels up to?

Each status below comes from a named source and date.

Solar PV · England, London

Planning

Planning
Granted
31 Jan 2024
DESNZ REPD, 3 Aug 2026
Construction
Not started
DESNZ REPD, 3 Aug 2026
Operational status
Proposed
DESNZ REPD, 3 Aug 2026

Connection

Connection
Solar PV project, epj_6ab50d94ab4c88ec

Measures

Rated power
0.3 MW
Connection capacity
Not published
Storage energy
Not published