Where is Lakeside EfW up to?

Each status below comes from a named source and date.

Energy from waste · England, South East

Planning

Planning
Granted
26 Mar 2000
DESNZ REPD, 3 Aug 2026
Construction
Built
DESNZ REPD, 3 Aug 2026
Operational status
Operational
1 Sep 2010
DESNZ REPD, 3 Aug 2026

Connection

Connection
Energy from waste project, epj_6d43bc753690102c

Measures

Rated power
30.0 MW
Connection capacity
Not published
Storage energy
Not published