Grid

Projects

Projects

Where is Treforest Weir, Cardiff Road - Hydroelectric Energy up to?

Each status below comes from a named source and date.

Pumped storage · Wales

Planning

Planning
Application submitted
2 Jan 2025
DESNZ REPD, 3 Aug 2026
Operational status
Proposed
DESNZ REPD, 3 Aug 2026

Connection

Connection
Pumped storage project, epj_704a8d92c3a3e747

Measures

Rated power
0.3 MW
Connection capacity
Not published
Storage energy
Not published