Where is Girvan Distillery, Bridge Mill Girvan - Anaerobic Digestion Extension up to?
Each status below comes from a named source and date.
Anaerobic digestion · Scotland
Planning
- Planning
- Granted
- 14 Feb 2025
- DESNZ REPD, 3 Aug 2026
- Construction
- Not started
- DESNZ REPD, 3 Aug 2026
- Operational status
- Proposed
- DESNZ REPD, 3 Aug 2026
Connection
- Connection
- Anaerobic digestion project, epj_723882389e286829
Measures
- Rated power
- 10.0 MW
- Connection capacity
- Not published
- Storage energy
- Not published