Grid

Projects

Projects

Where is North Clyde Recycling Centre (Waste AD) up to?

Each status below comes from a named source and date.

Anaerobic digestion · Scotland

Planning

Planning
Revised
25 Jun 2012
DESNZ REPD, 3 Aug 2026
Operational status
Proposed
DESNZ REPD, 3 Aug 2026

Connection

Connection
Anaerobic digestion project, epj_76226122d38291e4

Measures

Rated power
1.6 MW
Connection capacity
Not published
Storage energy
Not published