Projects
Where is North Clyde Recycling Centre (Waste AD) up to?
Each status below comes from a named source and date.
Anaerobic digestion · Scotland
Planning
- Planning
- Revised
- 25 Jun 2012
- DESNZ REPD, 3 Aug 2026
- Operational status
- Proposed
- DESNZ REPD, 3 Aug 2026
Connection
- Connection
- Anaerobic digestion project, epj_76226122d38291e4
Measures
- Rated power
- 1.6 MW
- Connection capacity
- Not published
- Storage energy
- Not published