Projects
Where is Lower Ellenden Farm, Water Lane - Solar Panels up to?
Each status below comes from a named source and date.
Solar PV · England, South East
Planning
- Planning
- Revised
- 30 Aug 2023
- DESNZ REPD, 3 Aug 2026
- Operational status
- Proposed
- DESNZ REPD, 3 Aug 2026
Connection
- Connection
- Solar PV project, epj_7854cf5742f4a896
Measures
- Rated power
- 6.0 MW
- Connection capacity
- Not published
- Storage energy
- Not published