Projects
Where is Cardiff Waste Water Treatment Works (Waste AD) up to?
Each status below comes from a named source and date.
Anaerobic digestion · Wales
Planning
- Planning
- Revised
- 16 Apr 2013
- DESNZ REPD, 3 Aug 2026
- Operational status
- Proposed
- DESNZ REPD, 3 Aug 2026
Connection
- Connection
- Anaerobic digestion project, epj_7884b9ae7ad78221
Measures
- Rated power
- 1.5 MW
- Connection capacity
- Not published
- Storage energy
- Not published