Where is Land at Lower House Farm up to?
Each status below comes from a named source and date.
Solar PV · Wales
Planning
- Planning
- Granted
- 10 Dec 2012
- DESNZ REPD, 3 Aug 2026
- Construction
- Built
- 1 Feb 2016
- DESNZ REPD, 3 Aug 2026
- Operational status
- Operational
- 21 Mar 2016
- DESNZ REPD, 3 Aug 2026
Connection
- Connection
- Solar PV project, epj_7abc543997b35fdf
Measures
- Rated power
- 8.1 MW
- Connection capacity
- Not published
- Storage energy
- Not published