Where is Bygrave Lodge Farm Anaerobic Digestion Facility (Farm AD) up to?

Each status below comes from a named source and date.

Anaerobic digestion · England, Eastern

Planning

Planning
Granted
1 May 2013
DESNZ REPD, 3 Aug 2026
Construction
Built
2 May 2013
DESNZ REPD, 3 Aug 2026
Operational status
Operational
20 Sep 2014
DESNZ REPD, 3 Aug 2026

Connection

Connection
Anaerobic digestion project, epj_84872640a3d8b9b3

Measures

Rated power
2.3 MW
Connection capacity
Not published
Storage energy
Not published