Where is Red Bull Racing Wind Tunnel, Sherbourne Drive – Solar Panels up to?

Each status below comes from a named source and date.

Solar PV · England, South East

Planning

Planning
Granted
14 Apr 2026
DESNZ REPD, 3 Aug 2026
Construction
Under construction
1 Jun 2026
DESNZ REPD, 3 Aug 2026
Operational status
Proposed
DESNZ REPD, 3 Aug 2026

Connection

Connection
Solar PV project, epj_8529816325d02882

Measures

Rated power
0.3 MW
Connection capacity
Not published
Storage energy
Not published