Projects
Where is New Rides Wind Farm up to?
Each status below comes from a named source and date.
Onshore wind · England, South East
Planning
- Planning
- Granted
- 9 Aug 2017
- DESNZ REPD, 3 Aug 2026
- Construction
- Built
- 7 Jun 2018
- DESNZ REPD, 3 Aug 2026
- Operational status
- Operational
- 1 Dec 2018
- DESNZ REPD, 3 Aug 2026
Connection
- Connection
- Onshore wind project, epj_868634715ace6c42
Measures
- Rated power
- 8.8 MW
- Connection capacity
- Not published
- Storage energy
- Not published