Projects
Where is Lakeside EfW Colnbrook (Replacement) up to?
Each status below comes from a named source and date.
Energy from waste · England, South East
Planning
- Planning
- Withdrawn
- 28 Jul 2020
- DESNZ REPD, 3 Aug 2026
Connection
- Connection
- Energy from waste project, epj_8916b2876cd5c594
Measures
- Rated power
- 40.0 MW
- Connection capacity
- Not published
- Storage energy
- Not published