Projects
Where is Lambdown Terrace, Swinton Barracks - Solar Panels up to?
Each status below comes from a named source and date.
Solar PV · England, South West
Planning
- Planning
- Granted
- 8 Aug 2025
- DESNZ REPD, 3 Aug 2026
- Construction
- Not started
- DESNZ REPD, 3 Aug 2026
- Operational status
- Proposed
- DESNZ REPD, 3 Aug 2026
Connection
- Connection
- Solar PV project, epj_9003c3336fe40f93
Measures
- Rated power
- 0.8 MW
- Connection capacity
- Not published
- Storage energy
- Not published