Projects
Where is Eyemouth Freezers, Toll Bridge Road - Solar Panels up to?
Each status below comes from a named source and date.
Solar PV · Scotland
Planning
- Planning
- Granted
- 4 Apr 2024
- DESNZ REPD, 3 Aug 2026
- Construction
- Not started
- DESNZ REPD, 3 Aug 2026
- Operational status
- Proposed
- DESNZ REPD, 3 Aug 2026
Connection
- Connection
- Solar PV project, epj_9639af4eb0605a7c
Measures
- Rated power
- 1.2 MW
- Connection capacity
- Not published
- Storage energy
- Not published