Grid

Projects

Projects

Where is Fleetwood Energy Centre up to?

Each status below comes from a named source and date.

Energy from waste · England, North West

Planning

Planning
Revised
15 Sep 2011
DESNZ REPD, 3 Aug 2026
Operational status
Proposed
DESNZ REPD, 3 Aug 2026

Connection

Connection
Energy from waste project, epj_986ab5345c9d43cb

Measures

Rated power
10.0 MW
Connection capacity
Not published
Storage energy
Not published