Projects
Where is Fleetwood Energy Centre up to?
Each status below comes from a named source and date.
Energy from waste · England, North West
Planning
- Planning
- Revised
- 15 Sep 2011
- DESNZ REPD, 3 Aug 2026
- Operational status
- Proposed
- DESNZ REPD, 3 Aug 2026
Connection
- Connection
- Energy from waste project, epj_986ab5345c9d43cb
Measures
- Rated power
- 10.0 MW
- Connection capacity
- Not published
- Storage energy
- Not published