Grid

Projects

Projects

Where is Faltec, International Drive - Solar panels up to?

Each status below comes from a named source and date.

Solar PV · England, North East

Planning

Planning
Revised
5 Jun 2024
DESNZ REPD, 3 Aug 2026
Operational status
Proposed
DESNZ REPD, 3 Aug 2026

Connection

Connection
Solar PV project, epj_99ce241373003b7b

Measures

Rated power
0.7 MW
Connection capacity
Not published
Storage energy
Not published