Grid

Projects

Projects

Where is Alton Sport Centre - Solar Panels up to?

Each status below comes from a named source and date.

Solar PV · England, South East

Planning

Planning
Revised
21 Jan 2025
DESNZ REPD, 3 Aug 2026
Operational status
Proposed
DESNZ REPD, 3 Aug 2026

Connection

Connection
Solar PV project, epj_a8c1d790079381ba

Measures

Rated power
0.4 MW
Connection capacity
Not published
Storage energy
Not published