Grid

Projects

Projects

Where is Princes Foods,Raw Materials Warehouse Bridge Road - Solar Photovoltaic System up to?

Each status below comes from a named source and date.

Solar PV · England, East Midlands

Planning

Planning
Granted
13 Mar 2023
DESNZ REPD, 3 Aug 2026
Construction
Not started
DESNZ REPD, 3 Aug 2026
Operational status
Proposed
DESNZ REPD, 3 Aug 2026

Connection

Connection
Solar PV project, epj_aaaaa77e014b17be

Measures

Rated power
0.7 MW
Connection capacity
Not published
Storage energy
Not published