Grid

Projects

Projects

Where is Fibrepower, Slough up to?

Each status below comes from a named source and date.

Energy from waste · England, South East

Planning

Planning
Granted
29 Mar 1999
DESNZ REPD, 3 Aug 2026
Construction
Built
DESNZ REPD, 3 Aug 2026
Operational status
Operational
1 May 2002
DESNZ REPD, 3 Aug 2026

Connection

Connection
Energy from waste project, epj_aaf4abd13d92140b

Measures

Rated power
50.0 MW
Connection capacity
Not published
Storage energy
Not published