Grid

Projects

Projects

Where is Symonds Farm Power Ltd (Farm AD) up to?

Each status below comes from a named source and date.

Anaerobic digestion · England, Eastern

Planning

Planning
Granted
7 Sep 2009
DESNZ REPD, 3 Aug 2026
Construction
Built
DESNZ REPD, 3 Aug 2026
Operational status
Operational
1 Mar 2012
DESNZ REPD, 3 Aug 2026

Connection

Connection
Anaerobic digestion project, epj_b2abdb0857374265

Measures

Rated power
1.4 MW
Connection capacity
Not published
Storage energy
Not published