Solar PV · England, London

Planning

Planning
Application submitted
14 May 2026
DESNZ REPD, 3 Aug 2026
Operational status
Proposed
DESNZ REPD, 3 Aug 2026

Connection

Connection
Solar PV project, epj_b366d101236c2d32

Measures

Rated power
0.2 MW
Connection capacity
Not published
Storage energy