Projects
Where is New Inn AD (Waste AD) up to?
Each status below comes from a named source and date.
Anaerobic digestion · Wales
Planning
- Planning
- Refused
- 16 Apr 2013
- DESNZ REPD, 3 Aug 2026
Connection
- Connection
- Anaerobic digestion project, epj_b4cbac339358eace
Measures
- Rated power
- 2.4 MW
- Connection capacity
- Not published
- Storage energy
- Not published