Grid

Projects

Projects

Where is Solar farm at land at The Willows, Uttoxeter up to?

Each status below comes from a named source and date.

Solar PV · England, West Midlands

Planning

Planning
Granted
24 Jul 2015
DESNZ REPD, 3 Aug 2026
Construction
Built
12 Dec 2016
DESNZ REPD, 3 Aug 2026
Operational status
Operational
31 Mar 2017
DESNZ REPD, 3 Aug 2026

Connection

Connection
Solar PV project, epj_b7c99588b98100a5

Measures

Rated power
6.4 MW
Connection capacity
Not published
Storage energy
Not published