Grid

Projects

Projects

Where is Beckton STW Biodiesel Power Plant up to?

Each status below comes from a named source and date.

Biomass · England, London

Planning

Planning
Granted
DESNZ REPD, 3 Aug 2026
Construction
Built
DESNZ REPD, 3 Aug 2026
Operational status
Operational
1 Dec 2010
DESNZ REPD, 3 Aug 2026

Connection

Connection
Biomass project, epj_b8200718300f8b7a

Measures

Rated power
8.0 MW
Connection capacity
Not published
Storage energy
Not published