Projects
Where is Beckton STW Biodiesel Power Plant up to?
Each status below comes from a named source and date.
Biomass · England, London
Planning
- Planning
- Granted
- DESNZ REPD, 3 Aug 2026
- Construction
- Built
- DESNZ REPD, 3 Aug 2026
- Operational status
- Operational
- 1 Dec 2010
- DESNZ REPD, 3 Aug 2026
Connection
- Connection
- Biomass project, epj_b8200718300f8b7a
Measures
- Rated power
- 8.0 MW
- Connection capacity
- Not published
- Storage energy
- Not published