Grid

Projects

Projects

Where is Beddington AD Facility (Waste AD) up to?

Each status below comes from a named source and date.

Anaerobic digestion · England, London

Planning

Planning
Withdrawn
7 Jul 2017
DESNZ REPD, 3 Aug 2026

Connection

Connection
Anaerobic digestion project, epj_b9040b9969d6edb9

Measures

Rated power
2.0 MW
Connection capacity
Not published
Storage energy
Not published