Projects
Where is Herbert Woods, Bridge Road - Solar Panels up to?
Each status below comes from a named source and date.
Solar PV · England, Eastern
Planning
- Planning
- Withdrawn
- 13 Feb 2023
- DESNZ REPD, 3 Aug 2026
Connection
- Connection
- Solar PV project, epj_b9b167569e0279c0
Measures
- Rated power
- 0.2 MW
- Connection capacity
- Not published
- Storage energy
- Not published