Projects
Where is M74 Central Coalburn (Waste AD) up to?
Each status below comes from a named source and date.
Anaerobic digestion · Scotland
Planning
- Planning
- Permission expired
- 5 Nov 2012
- DESNZ REPD, 3 Aug 2026
Connection
- Connection
- Anaerobic digestion project, epj_ba7984c29d26ee1d
Measures
- Rated power
- 5.0 MW
- Connection capacity
- Not published
- Storage energy
- Not published